What's due for your building, and when

Pick the systems you have and when they were last inspected. You'll see the next twelve months, so you can book everything together.

The planner needs JavaScript. You can still request service or call 1-833-344-3473.

Timing follows the National Fire Code and the standards it names: every 12 months for most systems, every 6 months for kitchen suppression and dry chemical systems. Monthly checks you do yourself aren’t shown. Your local fire department has the final say for your building.

The requirements, by province

All four provinces build their fire codes on the National Fire Code of Canada 2020, and Part 6 sends inspection work to the same standards. The intervals below apply in each province; the article numbers are the same in the national code and Alberta's edition.

  • Alberta: National Fire Code – 2023 Alberta Edition, in force since 1 May 2024.
  • British Columbia: BC Fire Code 2024, based on the National Fire Code 2020, in force since 8 March 2024. The City of Vancouver has its own fire by-law.
  • Saskatchewan: National Fire Code of Canada 2020, through The Fire Safety Regulations, in force since 1 January 2024.
  • Manitoba: National Fire Code of Canada 2020, through the Manitoba Fire Code Regulation, in force since 1 January 2024.
SystemWhat’s requiredHow oftenCode reference
SprinklersAnnual inspection and test; 5-year internal pipe checkEvery 12 months6.4.1.1 · NFPA 25
Fire alarmAnnual inspection and test of the whole systemEvery 12 months6.3.1.2 · CAN/ULC-S536
Standpipe and hoseAnnual inspection; flow test every 5 yearsEvery 12 months6.4.1.1 · NFPA 25
Fire pumpsAnnual flow test; weekly or monthly no-flow runEvery 12 months6.4.1.1 · NFPA 25
Kitchen suppressionMaintenance at least every 6 months and after any dischargeEvery 6 months2.6.1.9 · NFPA 96, NFPA 17A
Special hazardDry chemical every 6 months; others per their standardEvery 6 or 12 months6.6.1.1 · NFPA 17, 12, 2001
Fire extinguishersMonthly inspection; annual maintenance; 6-year and hydrostatic testsEvery 12 months6.2.1.1 · NFPA 10
Emergency lightingMonthly test; annual full-duration testEvery 12 months6.5.1.6, 6.5.1.7
Exit signsAnnual check; monthly for battery back-upEvery 12 months6.5.1.8
Backflow preventersAnnual test (water utility bylaw)Every 12 monthsCSA B64.10
Private fire hydrantsAnnual inspection and flow testEvery 12 months6.4.1.1 · NFPA 25
Fire safety planReview at intervals not greater than 12 monthsEvery 12 months2.8.2.1.(2)

This guide summarizes the code. Your local fire department has the final say for your building.

Building in Edmonton? Reports also go to Edmonton Fire Rescue Services.

Source: National Fire Code of Canada 2020 and 2023 Alberta Edition, Part 6 and Article 2.8.2.1; BC Fire Code 2024; NFPA 10, 17, 17A, 25 and 96; CAN/ULC-S536:2019; CSA B64.10.