What the fire code requires
Under Article 6.4.1.1, fire pumps follow NFPA 25. The pump is run without flow every week (some electric pumps may run monthly), and a full flow test at churn, rated and peak flow is done every year by qualified personnel.
Your local fire department has the final say for your building.
What the visit covers
- The annual flow test and its readings against the pump’s rated curve
- Controller and transfer switch
- Diesel engine checks where fitted
- Packing, bearings and alarms
What you check between visits
The weekly or monthly no-flow run, recorded in the pump room log.
Repairs and deficiencies
Anything that doesn’t meet the standard is listed as a deficiency in your report, with a quote to fix it. The report and the quote look the same at every member. Accept the quote and the same tracking number follows the repair.
Often in the same building: Sprinklers · Standpipe and hose · All services
Source: National Fire Code of Canada 2020, Article 6.4.1.1; NFPA 25-2017, Section 8.3.
Book everything in one request
Tick every system in the building and we line the visits up, so one coordinator handles the lot.