What the fire code requires
Article 6.4.1.1 of the National Fire Code says water-based fire protection systems must be inspected, tested and maintained to NFPA 25. That means a full inspection and test every year, an internal check of the piping every 5 years, and shorter checks of gauges, valves and alarm devices in between.
Your local fire department has the final say for your building.
What the visit covers
- Control valves open and supervised
- Sprinklers free of paint, damage and storage too close
- Waterflow alarm test and main drain test
- Dry and pre-action valve trip tests on their own schedule
- Gauges read and checked against their 5-year date
- A written report with every deficiency listed
What you check between visits
Valves stay open and locked, storage stays at least 457 mm (18 in.) below the sprinklers (NFPA 25), and the heat stays on in rooms with wet pipe.
Repairs and deficiencies
Anything that doesn’t meet the standard is listed as a deficiency in your report, with a quote to fix it. The report and the quote look the same at every member. Accept the quote and the same tracking number follows the repair.
Questions
How long does the annual test take?
It depends on the number of risers and valves; your coordinator gives a time window when the visit is confirmed.
Will the alarm sound?
Yes, during the flow test. We tell your monitoring company and occupants beforehand, as the fire code asks for a notification procedure (Article 6.1.1.3).
Often in the same building: Fire pumps · Standpipe and hose · All services
Source: National Fire Code of Canada 2020, Article 6.4.1.1; NFPA 25-2017.
Book everything in one request
Tick every system in the building and we line the visits up, so one coordinator handles the lot.